JobTarget Logo

Typhoon Halong Lead Carpenter in Bethel, Alaska at Association of Village Council Presidents

Job Function: Admin/Clerical/Secretarial
Association of Village Council Presidents
Bethel, Alaska, 99559, United States
Posted on

Explore Related Opportunities

Job Description

Description:

SUMMARY: Lead carpenters must be able to lead a crew of 3 to 4 people. Remote Alaska residential remodeling experiences a plus.

PERFORMANCE RESPONSIBILITIES: include the following. Other duties may be assigned:

  • Study individual job sites, plan work and accurately take off construction material
  • Estimate amount of work and time required for job
  • Experience building foundations and leveling buildings.
  • Experience with all phases of residential construction. Installation of windows, doors, Insulation, sealing, flooring siding and roof work. Able to lay out and build stairs. Finish carpentry. Setting cabinets and counter tops. General understanding of electrical and plumbing.
  • Manage materials and supplies as necessary to facilitate the efficient progression of work on the job.
  • Understand construction logistics in Rural Alaska.
  • Prepare project labor coding on timesheets
  • Work with Human Resources Department, Transportation Director to hire supervisor, discipline, and if n necessary fire onsite employees.
  • Interact with the general public maintaining a professional attitude and working relationship.
  • Travels frequently within the region for projects.
Requirements:

QUALIFICATIONS: To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Fluency in Yup’ik and English is strongly preferred. Work will be in outdoor environments. May travel by jet, small plane, four wheeler, snow machine, boat.

REQUIREMENTS:

Supervisory Experience

Proof (evidence) of construction supervisory experience – minimum 4 years experience.

Provide resume of previous employment with references

Show proficiency with residential construction

EDUCATION and EXPERIENCE: Must have a High school diploma or GED. Four (4) years working in a carpenter position. Apprenticeship trade in construction or maintenance is strongly preferred. Must have experience in and knowledge of Personal Protective Equipment (PPE) and use it.

Certificates, Licenses, Registrations: Valid State of Alaska Driver’s License with a good enough driving record to be insured on the AVCP Vehicle Policy.


Job Location

Bethel, Alaska, 99559, United States

Frequently asked questions about this position

Similar Jobs In Bethel, Alaska

Typhoon Halong Carpenter

Association of Village Council Presidents
Bethel, Alaska

Typhoon Halong Lead Carpenter

Association of Village Council Presidents
Bethel, Alaska

HIP Carpenter

Association of Village Council Presidents
Bethel, Alaska

LIHEAP Carpenter

Association of Village Council Presidents
Bethel, Alaska

HIP Carpenter

Association of Village Council Presidents
Bethel, Alaska
Apply For This Position

Apply Now