Project Manager in Brighton, Colorado at Myers & Sons Construction, LLC
Explore Related Opportunities
Job Description
Location: Brighton, CO
Salary Interval: EXEMPT
Pay Range: $120,000.00 - $160,000.00
Application Instructions
Myers and Sons Construction is a Heavy Civil Construction Company. We specialize in Bridge Construction, Bridge Restoration, Roadway Rehabilitation, Water/Wastewater Treatment Plants, Concrete Bridge Overlays, Concrete Paving and Alternative Delivery Projects, including Design Build, CMGC, CMAR and Progressive Design Build throughout California and Colorado. For more information on our company please visit www.myers-sons.com
Position Description
We are currently looking for a Project Manager who is ready to engage on Treatment Plant projects in Colorado both hard bid and CMAR / CMGC. Below is a description of a couple of these projects.
Boulder Clarifier
The city owns and operates the WRRF, which is rated for a maximum month flow of 25 MGD of wastewater. The WRRF began operations in 1968, and the capacity and complexity of its treatment process has evolved based on growth and water quality regulation progression. The WRRF’s current wastewater treatment process uses four (4) secondary clarifiers to separate secondary solids and scum from clean secondary effluent. Three (3) of these were originally constructed and put into service circa 1987. These original three clarifiers are at the end of their useful life and in need of replacement.
Generally, the scope of work will involve:
Town of Eagle WWTP CMGC
We are currently in the Preconstruction phase of this project and will be moving to construction later this spring. The WWTP improvements project will be designed and constructed in two parts:
Part 1 – Wastewater Treatment Process Improvements (located within the existing treatment
building):
• New internal mixed liquor recycle (IMLR) system (3 pumps along with pipes, valves,
flow meters and appurtenances)
• Replacement of three existing aeration blowers with four new aeration blowers
• New valves for aeration piping
• Electrical upgrades for new blowers and IMLR system
• Instrumentation upgrades for new blowers and IMLR system
• Miscellaneous structural improvements (equipment pads, supports, baffle wall
supports)
Part 2 – New Chemical Storage Building:
• Construction of a new chemical storage building
• External chemical fill point stations
• Chemical feed systems for Micro-C and Caustic Soda
• Buried utility relocation in the chemical building footprint within the WWTP property
• Site grading, drainage, erosion and sediment control around the chemical building
footprint
• Electrical service to the new chemical storage
• Heating and ventilation for the new chemical storage
The ideal candidate is capable of thinking outside the box, understands multi-staged construction projects, is detailed oriented with experience in Treatment Plant construction. The position is directly accountable for the safety, financial performance, and team development on site.
To perform this job successfully, an individual must be able to perform each essential duty satisfactorily.
Benefits:
Position Requirements
Qualifications:
Equal Opportunity Employer
Myers & Sons Construction is proud to be an equal opportunity and affirmative action employer regardless of race, color, gender, age, sexual orientation, gender identity, religious beliefs, marital status, genetic information, national origin, disability, or protected veteran status