QC Electrical Engineer – Data Center Construction in at SWJ TECHNOLOGY, LLC
Job Function: Engineering
SWJ TECHNOLOGY, LLC
United States
Posted on
Explore Related Opportunities
Job Description
SWJ Technology specializes in providing engineering, planning, and project management services across various industries. We are currently seeking QC Electrical Engineer - Data Center Construction - for a client in the commercial and industrial construction industry. This is a Contractor or direct hire. If you’re eager to grow your career and make a meaningful impact on exciting projects, we look forward to your application.
PURPOSE:
The QC Electrical Engineer - Data Center Construction- ensures quality, compliance, and reliability of electrical installations on data center construction projects. The role focuses on inspection, verification, and documentation of mission-critical electrical systems in accordance with project specifications, codes, and industry standards.
RESPONSIBILITIES:
PHYSICAL REQUIREMENTS:
FLSA STATUS/WORKING SCHEDULE:
DISCLAIMER:
This job description is a high-level overview of general expectations of this position. It is not intended to list every responsibility of the position, nor does it represent an employment contract of any kind.
PURPOSE:
The QC Electrical Engineer - Data Center Construction- ensures quality, compliance, and reliability of electrical installations on data center construction projects. The role focuses on inspection, verification, and documentation of mission-critical electrical systems in accordance with project specifications, codes, and industry standards.
RESPONSIBILITIES:
- Implement and manage electrical quality control activities for data center construction projects
- Inspect installation of mission-critical electrical systems, including:
- Medium- and low-voltage power distribution
- UPS systems, battery systems, and energy storage
- Generators, fuel systems, and transfer switches (ATS/STS)
- PDUs, RPPs, busways, and branch circuit installations
- Grounding, bonding, and lightning protection systems
- Verify compliance with construction drawings, specifications, method statements, and ITPs
- Review and approve electrical material submittals, shop drawings, and as-built documentation
- Witness factory acceptance tests (FAT), site acceptance tests (SAT), and commissioning activities
- Identify non-conformances (NCRs), track corrective actions, and verify closeout
- Coordinate with construction, commissioning, and design teams to resolve quality issues
- Support integrated systems testing (IST) readiness and turnover documentation
- Ensure compliance with applicable codes and standards (NEC, NFPA, IEEE, local AHJ requirements)
- Maintain quality records, inspection reports, and turnover packages
- Bachelor’s degree in Electrical Engineering or equivalent
- 5+ years of experience in electrical construction QC, with a strong focus on data centers or mission-critical facilities
- Proven experience inspecting critical power infrastructure and redundancy systems (N, N+1, 2N)
- Strong knowledge of electrical codes, standards, and QA/QC procedures
- Ability to read and interpret one-line diagrams, construction drawings, and technical specifications
- Experience working with EPC contractors, subcontractors, and commissioning agents
- Strong attention to detail and documentation accuracy
- Assertive but collaborative communication style
- Ability to work in fast-paced, schedule-driven construction environments
- Strong problem-solving and organizational skills
- Professional Engineer (PE) license or equivalent
- Experience with commissioning and integrated systems testing (IST)
- Familiarity with BIM / Revit and electrical documentation platforms
- Experience with hyperscale or colocation data center projects
- Certification in Quality Management or Inspection (e.g., ISO 9001, CQE)
PHYSICAL REQUIREMENTS:
- Work is normally performed in an office, laboratory, manufacturing floor, or machine shop setting where physical work includes, but is not limited to sitting, standing, reaching, kneeling, bending, and lifting up to 25 lbs.
- Must be able to understand and comply with all relevant safety practices.
FLSA STATUS/WORKING SCHEDULE:
- Location: Confidential, Southern America
- Schedule: Flexible working hours required/ Willingness to travel to project sites as required
- Overtime: As required
- Assignment Start: ASAP
DISCLAIMER:
This job description is a high-level overview of general expectations of this position. It is not intended to list every responsibility of the position, nor does it represent an employment contract of any kind.
SWJ TECHNOLOGY and all of its subsidiaries (i.e., NGE EQUIPMENT and ProjectOne US) are Equal Opportunity Employers and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender, disability status, protected veteran status, or any other characteristic protected by law.
Scan to Apply
Just scan this QR code to apply from your phone.
Job Location
United States
Frequently asked questions about this position
Apply NowYour application goes straight to the hiring team
By submitting your application, you understand and agree to JobTarget's
Terms of Use and
Privacy Policy.